Home / Projects /
We have collaborated with the best architectural firms, expanding the potential of a technical system that today can fit into any design idea, from modern green business centers, data centers and showrooms, to the renovation of historic buildings, industrial redevelopments, museums, and even places of cult.
Our raised access floor range allows you to find the most suitable solution for each application.
Project
LUNDBECK office expansion
The expansion of Lundbeck's production unit in Padua, a company operating in the pharmaceutical sector, is a project that stands out for its elegance and quality of systems. In fact, integrated solutions are
Project
PIRELLI 35 (IN PROGRESS)
PIRELLI 35, owned by COIMA Sgr, is among the largest urban regeneration projects designed by Park Associati and Snøhetta. The building will be fully integrated by Nesite's raised floor solutions, with systems designed
Project
SEIMILANO (IN PROGRESS)
SeiMilano is the city-garden by Mario Cucinella Architects designed to create an interconnected and sustainable urban ecosystem. The project, which involves the redevelopment of more than 300,000 sqm, will employ Nesite raised flooring
Project
Ferrero Technical Center
Ferrero Technical Center, raised floor fits into the concept of “slow architecture” – emblematic of Studio Frigerio Design Group projects – as a modular and modulable system capable of living through time and over time thanks to its flexibility, promoting ethical and environmentally friendly use of resources.
Project
BASSI BUSINESS PARK
Bassi Business Park, one of the largest urban redevelopment projects underway in Milan, is the new complex of buildings with high energy and environmental performance, which will lead to the recovery of more
Project
Adriatic LNG
To conserve, to appropriate the pre-existing while respecting its historical authenticity, to hand down to posterity aware of the importance of leaving evidence. These are the premises that guided the realization of the new Adriatic LNG work hub, an intervention perfectly integrated in the original architecture, where the installation of raised floor has mainly filled the gaps in terms of plant engineering and space.organization.
Project
Gioia 22
Nesite in "gioia 22" Project More than 25,000 square meters of raised floor for the new tower with a strongly green footprint, in Milan's Porta Nuova - Gioia district. The Project Part of
Project
Showroom Nesite in Milan
New Nesite Showroom in Milan A flexible design place that hosts all the raised floor proposals and the Nesite Interior solutions: in Sesto San Giovanni, inside the logistic headquarters of the leader Transpack. The
Project
Redevelopment of former Richard Ginori area, Milan
Flexibility, quality of the production chain and use of certified and sustainable materials, Nesite's raised floor meets the values and principles of the project, designed to reduce polluting emissions and water and energy consumption, using 100% renewable sources.
Project
Sanlorenzo Yachts
Nesite raised floor in the office project of Sanlorenzo Hq in Ameglia, designed by Lissoni Casal Ribeiro team. Sanlorenzo Yachts Project Immersed in the greenery of the Montemarcello-Magra natural park and overlooking the
Project
Zamasport Hq
Fluid and sustainable work places, the Nesite raised floor in the new Zamasport headquarters, designed by Frigerio Design Group
Project
Athesys
From a simple "option" to an ethical and conscious choice, sustainability really matters today and Athesys, with the renovation of its headquarters, wanted to give a real demonstration of this.