Product
Calcium Sulphate
Application
Interno
Location
Milan
Contractor
COIMA Sgr
Design
Park Associates - Snøhetta
Total Area
27.000m2
Year
2023
Home / Projects / Directional / PIRELLI 35 (IN PROGRESS)
PIRELLI 35, owned by COIMA Sgr, is among the largest urban regeneration projects designed by Park Associati and Snøhetta. The building will be fully integrated by Nesite’s raised floor solutions, with systems designed to complement the work from the high standards of sustainability, automation and connectivity.
THE PROJECT
Pirelli 35, one of the symbols of Milan’s 1960s business center, is reborn thanks to the retrofitting project signed by Park Associati and Snøhetta, which focuses on the virtuous recovery of existing structures, according to ambitious environmental and social standards .
The new complex covers an area of about 45,000 sqm and involves redevelopment and expansion of the original building through the integration of the most effective practices in terms of sustainable building. In fact, the Pirelli 35 project includes the use of ventilated facades for thermoregulation, ultra-low impact technologies for energy needs, and use of only cradle-to-cradle certified materials.
Efficient, sustainable, flexible: Pirelli 35 will be LEED Platinum, nZEB and WELL Gold certified, to which is added the WiredScore certification, a new international rating system that assesses the quality of digital infrastructure.
WHY THE RAISED FLOOR.
Pirelli 35 is an intelligent complex with high automation and connectivity, the plant design of which becomes critical in enabling a high-performance configuration that is also scalable to the building’s upcoming needs.
In this context, the integration of the raised floor becomes an easy solution in building the necessary infrastructure, also facilitating future developments and/or modifications. In fact, the placement of systems is done in the plenum below, of various heights, where designers can have customizable technical compartments free of constraints.
SUPPLY DETAILS
• 27,000 sq m: System consisting of EPD-certified calcium sulfate panels, size 600×600 mm, thickness 30 mm, prepared for self-laying finishes.
Products in this project
All Products
Panels
Calcium Sulphate
Nesite uses very high density calcium sulfate (1600 kg/m3). Calcium sulphate panels are available in different thickness options: PG1 - PG2 - PG3 - PG6
Other
projects
All Projects
Showroom Sabiana
4.0, raised floor with resin finishing in the showroom sabiana in corbetta. Sabiana, the Italian excellence in the air conditioning sector, has inaugurated an exhibition area of around 1,300 square meters in the historical establishment located in Corbetta. The showroom opens after an accurate restyling and represents a real full-immersion in the innovative world of Sabiana. The space houses

Thélios HQ, Longarone
The particularity of the project lies in the installation, in certain areas, of a customised product based on precise aesthetic characteristics foreseen by the project design.

Sanlorenzo Yachts
Nesite raised floor in the office project of Sanlorenzo Hq in Ameglia, designed by Lissoni Casal Ribeiro team. Sanlorenzo Yachts Project Immersed in the greenery of the Montemarcello-Magra natural park and overlooking the river of the same name, the first volume completed by the Lissoni Casal Ribeiro team in the master plan, still in the completion phase,